Read the instruction before installation! Guarantee for material is valid if technology of installation is properly observed.
Laminate Alloc is installed into living spaces of business premises at the final stage of finishing works.
Relative air humidity in a room should be 40-60%, temperature – 18-23 C. Before installation keep Alloc unpacked at room temperature for not less than 48 hours. For a proper air circulation, place packages in a shape of a well.
- Do not install Alloc Chateau without hydrofilm!
- Do not install Alloc Chateau in bath- and shower rooms.
- Do not use Alloc Chateau covering as a beating structure. It is to be installed into previously laid base. (e.g. wooden floor, concrete blinding coat, linoleum)
- Alloc is installed using a floating technique.
- Boards are attached to each other by a fibro lock.
- Boards are not glued or nailed to a bearing layer.
- Thermal gap to be installed along the perimeter of a room and around heating pipes for natural draft of floor at temperature and humidity level change. Read more »